Chikonmati Tea Estate
310 kWp solar installation for Chikonmati Tea Estate - Agriculture sector, Darang, Assam.
Project overview
Chikonmati Tea Estate grows and processes tea at Chikonmati, near Bechimari on NH-15 in Assam’s Darrang district. Darrang is one of the state’s tea-growing districts, north of the Brahmaputra. The estate’s factory turns freshly plucked leaf into made tea on the same day. Withering-trough fans, rolling and CTC machines, conveyors and sorting lines all run on electricity. Demand peaks in the plucking season from March to November, when sunshine is also at its strongest. That makes on-site solar a close match for when the factory needs power. Fender Energy designed, supplied and installed a 310 kWp grid-connected solar plant for the estate. It uses Panasonic 585 Wp bifacial TOPCon modules. These capture sunlight on both faces of the panel, so they produce more power from reflected light than standard panels and hold up well in Assam’s heat and humidity. They are paired with Growatt inverters rated at 310 kW. Our team handled the engineering, installation, approvals from the Assam utility (APDCL) and grid synchronisation. We commissioned the plant in March 2025. The plant is expected to generate about 3.6 lakh units (kWh) of clean electricity a year. That lowers the factory’s grid and diesel costs through the manufacturing season and avoids an estimated 250 tonnes of CO₂ emissions each year. It has now run through two plucking seasons, and it supports the estate’s sustainability credentials with tea buyers and certification bodies.
Plan a project like Chikonmati Tea Estate.
Talk to our engineering team about feasibility, financing and timelines tailored to your site.